Wimbledon Centre Court
Roughly 1,101 metres of guttering surrounding Centre Court, waterproofed with FLEXITEC on time and on budget by JH Specialist Roofing.
The challenge
Centre Court at Wimbledon is ringed by approximately 1,101 metres of guttering. It needed a new, permanent waterproofing system capable of carrying away very large volumes of rainwater.
The solution
JH Specialist Roofing chose FLEXITEC for its high flexibility, which makes waterproofing complex details quick and straightforward, and for the durability of the cured membrane. Materials were supplied by JJ Roofing Supplies.
The result
The finished waterproofing exceeded every expectation, completed on time and on budget and backed by a 20-year guarantee.